Fresh Point & Sysco Fine Meats Toronto
Sysco Fine Meats Toronto and Fresh Point contracted BC Comfort Air Conditioning Limited to build a high-end Design Build new Food Processing facility.
BC Comfort assisted with the design, supply and installation of a fully operational mechanical system for this CFIA Complied Food Production Facility. Installations included:
- Variable Air Volume System
- High Efficiency Packaged Rooftop Units
- Food-Grade Compressed Air System
- Chemical and Sanitization Piping System associated with ECO Lab System
Click here to learn more about this new construction or read the complete factsheet.

BFI Service Garage in Coquitlam
BC Comfort Air Conditioning Limited was contracted by BFI Canada for the design-build of a new service garage for their line of waste management vehicles.
This project included office space, 8 service bays and a truck wash station utilizing recycled water. A special Ventilation & Controls system was also provided for Compressed Natural Gas trucks to meet the applicable code requirements.
Click here to learn more about this new construction or read the complete factsheet.
“The unique safety requirements of this facility allowed us to explore some creative and cost-effective design solutions.” – Jacob Mandy, B.Eng, Project Manager, BC Comfort