Retail Buildings
Mountain Equipment Co-op Project by BC Comfort Vancouver

Mountain Equipment Co-op

Address: 212 Brooksbank Ave, North Vancouver, BC Project Information: 22,000 Sq.ft of High End Retail Building- LEED Gold. Completion Date: Aug 2012 Project Type: New Construction Architect: Proscenium Architecture Mechanical Consultant: Pugeau Morel General Contractor: Ventana Construction Mechanical system description: Variable refrigerant flow system combined with In-floor heating and cooling system. Under floor air distribution for free cooling. CO2 demand ventilation control with heat recovery. Hybrid mechanical-natural ventilation system, controlled via Delta controls BMS. Roles and Responsibilities: Assisting client to provide the most energy efficient and cost effective HVAC system suitable for this application. Design, engineering, supply and installation of a fully operational mechanical system.

Queensborough Shoping Centre Project by BC Comfort Vancouver

Queensborough Shoping Centre

Address: 805 Boyd Street, New Westminster, BC Project Information:  Shopping centre retail building Completion Date:  Jan 2007 Project Type: New Construction-Design Build Architect: Chandler Associates Mechanical Consultant:  BC Comfort General Contractor: Wales Mclelland Construction Mechanical system description: Standard Packaged RTUs, Gas/electric Heat Cool system Roles and Responsibilities: Assisting client to provide the most energy efficient and cost effective HVAC system suitable for this application. Design, engineering, supply and installation of a fully operational mechanical system.

Vij’s restaurant Project by BC Comfort Vancouver

Vij’s restaurant

Address: 3106 Cambie St., Vancouver, B.C.
Project Information: 8,000 SF, 3 Storey Restaurant
Completion Date:  June 2015
Project Type: Design-Build
Mechanical Consultant: BC Comfort
General Contractor: Wales McLelland Construction
Mechanical System description:  Split Systems and Roof Top Units for Dining areas.  Demand Control Ventilation for Exhaust Fan and Make Up Air Unit in Kitchen areas.
1090 Lougheed Plaza Project by BC Comfort Vancouver

1090 Lougheed Plaza

Address: 1090 Lougheed Hwy. Coquitlam, BC Project Information: 45,000 Sq.ft of shopping centre retail building Completion Date: July 2012 Project Type: New Construction Mechanical Consultant:  ByCar Engineering General Contractor: Ventana Construction Mechanical system description: Standard Packaged RTUs, Gas/electric Heat Cool system Roles and Responsibilities: Supply and installation of a fully operational mechanical system.

Shoppers Drug Mart Project by BC Comfort Vancouver

Shoppers Drug Mart

Address: 911 Park Royal South, West Vancouver, BC Project Information: High End Retail Building- LEED Compliance Completion Date: Feb 2011 Project Type: New Construction Architect: Wensley Architecture Mechanical Consultant:  Cobalt Engineering General Contractor: Norson Construction Mechanical system description: Variable Refrigerant Flow System combined High efficiency gas electric roof top units. Roles and Responsibilities: Supply and installation of a fully operational Mechanical System.

Surrey West Shopping Centre Project by BC Comfort Vancouver

Surrey West Shopping Centre

Address: 1463 & 12477 88th Ave, Surrey Project Information: 30,000 Sq.ft of shopping centre retail building Completion Date: Dec 2007 Project Type: New Construction-Design Build Architect: MQN Architects Mechanical Consultant:  BC Comfort General Contractor: Ventana Construction Mechanical system description: Standard Packaged RTUs, Gas/electric Heat Cool system Roles and Responsibilities: Assisting client to provide the most energy efficient and cost effective HVAC system suitable for this application. Design, engineering, supply and installation of a fully operational mechanical system.

Sheraton Vancouver Airport Conference Centre Addition Project by BC Comfort Vancouver

Sheraton Vancouver Airport Conference Centre Addition

Address: 7551 Westminster Hwy, Richmond, B.C.
Project Information: 10,000 SF Conference Centre with Commercial Kitchen and washrooms. 
Completion Date:  January 2016
Project Type: Design-Build
Mechanical Consultant: BC Comfort
General Contractor: Prism Construction
Mechanical System description:  Split System Air Conditioners with Gas Furnaces in Conference Areas.  Gas fired Make up Air Unit and NFPA Kitchen Exhaust.

View other projects

1

14

BCC Banners

16

BCC Banners

10

7

6

13

12

3

2

8

5

BCC Banners

11

BCC Banners (3)

BCC Banners (4)